Oct
2012
ABB QatarRemoval of 6x 132KV LPOF terminations
Jun
2011
Siemens WLL60x 66KV Pfisterer Connex terminations at
Khalifat, Old Al Ghanem, Merghab Mall & Umm Ghuwalina Substations

GTC/240D/2008 (Phase 9, Package S3)
Jun
2011
Siemens WLL18x 66KV Pfisterer Connex terminations
Umm Ghuwalina SS
Nov
2010
PrysmianProvision of jointing assistants for 132, 220 and 400KV cable installation
Sep
2008
SEC-EOAConstruction of the U/G and O/H T/L for Al Fursan 115/13.8KV substation. Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Jun-06SEC-EOAInstallation of 115KV, XLPE Cable Circuits for Saihat S/S. Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Dec. 2004 – Nov. 2006 SEC-EOA69 KV U/G T/L Cables and F/O Cables between Dammam P/P and Muthalath S/S. Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Jan. 2005 – Apr. 2007 SEC-EOA69 KV U/G T/L Cables and F/O Cables between Khobar BSP and As-Salam S/S. Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Dec. 2005 SEC-COA/NEBRAS AL SHARK Install, terminate and joint the 132KV, 1200mm2 XLPE cables type SEFAG including HV test and non Hipot test.
Installation of 36F FO Splitter and Termination box including testing and commissioning. Circuit 8118-9015 (A&B)
Jan. 2006 SEC-EOA/NCCInstall and terminate the 132KV cable, 300mm2 Oil Immersed Termination including HV and Non-Hipot test at Arar S/S and Markaz Zallum S/S
Aug-05SEC-EOA/ARABIAN
BEMCO
Install and terminate the 115KV cable, 1600mm2 and 630mm2 Cu. XLPE GIS Sealing End Outdoor Sealing End (G&W). Construction of new 115KV/13.8KV Al Nuza S/S.
Jun-04SEC-EOA/ARABIAN BEMCOInstall and terminate the 69KV 630mm2 XLPE cable GIS Sealing End and 69KV Outdoor/Indoor Heat Shrikable termination at Sahilia S/S and Bayonia S/S #2.
Nov-04SEC-EOA/ LARSEN & TOUBROCable Laying of 230KV and 115KV cable, 1x2000mm2 XLPE cable between Transformer to GIS. Ghazlan P/P and New 230KV/115KV Juaymah BSP
Feb. 2003 – Feb. 2004 SEC-EOA/National Contracting Co. Ltd. Installation of 69KV Power Cable and Fiber Optic Cable to Thuqbah BSP – Al-Jazeerah S/S, Dammam BSP – Anood S/S and Ta’lemi S/S – Khobar Local Office.
Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Mar 2004 – May 2004 NSIF/SEC-EOA
69KV Underground Cables from Transition Structure to NSIF S/S. Construction Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Feb – Aug. 2003 ABB Cont. Co., Riyadh
115KV Power Supply for SIPC Substation Install cable, Joint, Terminate and test including Fiber Optic Cable Installation, Splice and Test.
Dec. – May 2003 ABB Cont. Co., Riyadh
Install 2500mm2 230KV cables, splicer assistance, testing.
Aug. – Dec. 2002 SEC-EOA/ SSEM Est.,
Al-Khobar
Supply, Install, Terminate and Test 69KV cables at Al-Waha S/S
Dec 02 – June 03 SEC-EOA/Al-ojaimi Est., Dammam
Supply, Install, Terminate and Test 69KV cables at Al-Rabwah S/S
Mar. 2002 – Mar. 2003 KFUPM/ SEC-EOA
Samir M. A. Mohsen
69KV Underground Transmission Line & Fiber Optic Cables Installation Between Khobar BSP & KFUPM 69/13.8KV Substation#2.
Turnkey engineering-procurement-construction. Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Oct 2001- Apr 2002 Saudi Condreco/Royal
Commission, Jubail
Install, Terminate & Test 115KV Cables SWC-1 to SWC-2.
Jun 2001 – Aug. 2003 SEC-EOA
Abdulaziz Y. Al-Sulaim
69KV G/U Cables from Dammam Power Plant to Al-Rabwah and Al-Waha Substations. Turnkey engineering-procurement-construction. Includes all Civil, HV cable and Fiber Optic cable works plus testing and commissioning.
Sep 2001 – Nov 2001 NEMCOR/Saudi AramcoInstall, Terminate and Test 69KV Cables.
Mar 2000 - May 2003 MEW Bahrain/
Behzad – S Masood A
66KV Development 1997 – 2001, 66KV Cable Installation, Jointing & Testing.
Nov 2000 – Apr 2001 Ibn Zahr/ABB Cont.
Co. Ltd.,
Mohammed Samkari
Ibn Al-Baytar 230KV Substation & HV Cable Connection – Installation and Testing of 230KV LPOF and Fiber Optic Cables.
Mar 2000 – Jun 2000 Saudi Condreco LtdP & C Seawater Cooling (SWC) Pumphouse No.2 115KV Project
Aug 1998 – Feb 2000 SEC-EOA
Abdullah A. Bashir
Replacement of 69KV XLPE Underground Cables and fiber optic cable circuits. Turnkey engineering-procurement-construction.
Includes all civil and HV cable works plus testing and commissioning. Dammam BSP – Anak Lines 1 & 2 & Ummal G/S –Muthalath G/S.
Jun 1998 - Oct 1999 Eastern Petrochemical Co (Sharq)
Chiyoda Petrostar Ltd.
Siemens AG
Joachim Loffler
 
Jan 1996 - Jun 1997 SEC-EOA
Abdullah A. Bashir
Replacement of 69KV XLPE Under ground Cables in Dammam Operating Area. Turnkey engineering-procurement-construction- includes all civil and HV cable works plus testing and commissioning.
May 1996 - Nov 1997 SEC-EOA
Abdullah A. Bashir
Reinforcement of 69KV system in Dammam Operating Area. 69KV XLPE u/g power and fiber optic cables. Turnkey engineering- procurement-construction- includes all civil and HV cable works plus testing and commissioning.
Mar 1995 - Aug 1995 Kuwait – MEW/
Mitsubishi Electrical Corporation
T. Oshimo
Install 132KV LPOF cables. Install, terminate & test 11KV T/F cables. Install oil tanks and oil control system for reconstruction of 3 substations in Sabah Al-Salem area, Kuwait.
Dec 1995 - Mar 1997 SEC-EOA
Abdullah A. Bashir
Permanent 69KV Power Supply to Qatif Area Grid Stations. 69KV Power and fiber optic communication/control cables. Turnkey engineering-procurement-construction-includes all civil and HV cable works, plus testing and commissioning.
Apr 1993 - Jul 1994 SEC-EOA
Shafi E. Zeitoun
Power system upgrade in Dammam Operating Area. Turnkey engineering-procurement-construction. Includes all civil and HV cable works plus testing and commissioning. 69KV XLPE cables and fiber optic cables-underground. Power cable length 115Km.
Dec 1992 - Nov 1994 SEC-EOA/Arabian
Industrial Constn. Co
S. Ishihara
230KV Power Supply to Rakah Bulk Supply Point. Civil works and Installation of underground 230KV LPOF Cable and F/O cable. Cable length = 45 Km.
1992 - Apr 1993 Kuwait - Ministry of Electricity & Water (MEW)Installation, test and commission of 33KV XLPE power cable and pilot cable in Kuwait. 33KV XLPE cable length = 15Km.
Feb 1992 - Oct 1992 Saudi Arabian
Fertilizer Co (SAFCO)
F M Al-Nahhas
115KV XLPE U/G Power Supply and fiber optic cable to SAFCO Plant in Jubail. Cable length = 31.8km. Turnkey engineering-procurement-construction- plus testing and commissioning.
Feb 1992 - Oct 1992 National Industrial Gases Co
(GAS)
Ian Charlesworth
34.5KV power supply to NIGC phase III expansion project in Jubail. Turnkey engineeringprocurement- construction, plus testing and commissioning. Cable order length = 18km.
Feb 1991 - Apr 1992 SEC-EOA
Shafi E. Zeitoun
69KV U/G power supply to Umm As-Sahik S/S. 69KV XLPE Cable length = 30km. Turnkey engineering-procurement-construction, plus testing and commissioning.
Jul 1990 - Apr 1992 SEC-COA
Mitsubishi Corporation
H. Sawa
132KV LPOF cable circuits for diversion at Dariyah Road/Makkah road in Riyadh. Cable length 18 Km. Perform all civil and cable installation works. Assist with cable jointing and testing.
Jul 1990 - Nov 1991 SEC-COA
Mitsubishi Corporation
S. Nohara
132KV LPOF cable circuits for reinforcement of double link between S/S 8001 and S/S 8003 in Riyadh. Cable length = 9 km. Perform all civil and cable installation works. Assist with cable jointing and testing and commissioning.
Oct 1989 - Apr 1990 SEC-EOA
Shafi E. Zeitoun
Emergency Replacement of 69KV cable circuits to Tarut island. 69KV XLPE cable length = 60 km. Turnkey engineering- procurement-construction, plus testing and commissioning.
Oct 1989 - Dec 1990 SEC-COA
Mitsubishi Corporation
Y. Okazaki
132KV LPOF cable circuits from 380/132KV S/S 9004 Sections III & IV in Riyadh. Cable length = 30 km. Perform all civil engineering and works. Install cable and assist with testing and commissioning.
Oct 1988 - Aug 1989 SEC-EOA
SADIP
R. Hraki
Supply & Install 69KV cable between SEC-EOA S/S & SADIP Main S/S. 69KV XLPE Cable length = 9 Km. Turnkey engineeringprocurement- construction, plus testing and commissioning.
Aug 1988 -Jun 1989SEC-COA
Saudi Arabian National Guard
132KV XLPE Cable circuit from S/S 8015 to 8049 for SANG Khashm Al-Aan Housing Project. 132XLPE cable length = 18 Km. Turnkey engineering-procurement-construction, plus testing and commissioning.
Jul 1987 - Jun 1988 SEC-EOA
S. Al-Hamid
69KV Feeders and associated O/H Line work to Port of Dammam and Dhahran Airport. 69KV XLPE cable length = 46 Km. Turnkey engineering-procurement-construction, plus testing and commissioning.
Mar 1986 - Aug 1986 SEC-EOA
E. Wassef
69KV U/G Feeders & O/H Line to MODA complex facility. 69KV XLPE cable length = 18Km. Turnkey engineering, procurement construction, plus testing and commissioning. MODA = Ministry of Defense and Aviation.
Jun 1986 - May 1987 SEC-EOA
E. Wassef
69KV U/G Feeders to King Fahd International Airport. Turnkey Design, Procure, Construction, plus testing and commissioning. 69KV XLPE cable length = 150 Km.
Jun 1986 - Feb 1987 SEC-EOA
E. Wassef
Relocation of 69KV U/G Cable from Janubia G/S. 69KV XLPE cable length = 58Km.
Turnkey engineering – procurement - construction, plus testing and commissioning.